Apparently, and surprisingly, the town council voted 5-4 in favor of moving the turf project forward this past week. At best, I thought the TC would table this discussion since it's not a priority for the town at this current time and the fact that the track resurfacing project was voted down in November. Besides voter discontent for the track project, there are issues with proceeding forward with one project over the other, namely the drainage work that needs to be done to support both projects. Details here.
The BOE voted on moving forward with the turf project just before the November election assuming that *IF* the referendum for the track resurfacing passed both the track/turf could be done together to reduce cost and install a proper drainage system. However, the downfall of the track referendum throws a wrench into works since both projects share infrastructure and I believe installing the turf field will, to some degree, destroy parts of the track.
I welcome the fact that this project has been assigned to the PBC. The fact that we now have an extra set of eyes, unbiased to a degree, scrutinizing this effort is welcomed by me but not most on the BOE. For some reason, (my perception), some on the BOE, if not the administration, shutter at the thought that the PBC would get involved with any BOE-capital project. But I agree with Jimmy Sima's sentiment that the PBC will do the project in such a way that is best for the town.